New Recreational Center for the CCSU Blue Devils

Kaiser Hall Athletic Complex CCSU

New Britain, Connecticut

BVH is providing civil, structural, MEP and technology design services for this project that includes the construction of a new 70,000 SF recreation center on the CCSU campus at Ella Grasso Boulevard and Kaiser Drive.  The present 34,000 square foot air supported fabric structure comprise the north wing of the facility will be dismantled and replaced by a new multi-story structural steel frame building.

 

The new recreational center will create a new complex for the recreational, athletic and educational needs of the 12,000 CCSU students as well as faculty and staff.  The facility is anticipated to provide squash, racquetball, basketball and multi-purpose courts; as well as an elevated wellness track; exercise and fitness areas; studio space; offices and meeting rooms; and restroom, shower and locker facilities.

 

The project will also renovate the existing Kaiser Hall gymnasium to include the construction of a first and second floor entrance to the gymnasium; construction of a new 500 seat second floor air conditioned Press Box and VIP seating area.

 

All improvements will meet ADA standards and comply with CCSU facility standards.

Architect

Sasaki

 

Size / Cost

70,000 SF / $25.3 million

 

Services

Civil, structural, mechanical, electrical, plumbing/fire protection and technology design